CT6001A

6001AA.jpg


Production Product special point:


  1、 can use to vapor car move force Electricity Pool、 Electricity Pool group、 Big type Burning material Electricity Pool Wait Big Work rate Electricity Pool Of each Species Measurement test。

  2、 mold Piece Chemical Assume meter, through Road number the amount、 the amount Cheng can With use Household need begging With meaning set system。

  3、 each One through Road can Ren meaning Assume Set Constant flow Charge put Electricity、 Constant Pressure Charge put Electricity、 Constant flow Constant Pressure Charge put Electricity、 Constant flow Constant Pressure put Electricity、 Constant Work rate put Electricity、 Constant Resistance put Electricity、 straight flow Inside Resistance Measurement test、靜 Set work Make mold formula。

  4、 each through Road Finish all alone Standing, can Minute do not work Make versus Do not with Of Measurement test field view, mutual Do not Shadow ring。

  5、 Assume Prepare With Prepare Finish good Of soft、 hard Piece many level Guarantee Protection, Take and anxious stop open turn off。

  6、 double toAC-DC Assume meter, mention high can source Profit use rate; in put Electricity Measurement test ring territory under, Electricity can anti- Feed Electricity network, Festival can ring Guarantee。

  7、 Assume Prepare from band control system end end, can Take off machine work Make。


6001A.jpg


type number

CT6001A

Electricity flow the amount Cheng(A)

30A/60A/100A/120A/200A/300A/400A/480A

Electricity Pressure the amount Cheng(V)

5V

work Make mold formula

Constant flow Charge put Electricity、 Constant Pressure Charge put Electricity、 Constant flow Constant Pressure Charge put Electricity、 Constant flow Constant Pressure put Electricity、 Constant Work rate Charge put Electricity、 Constant Resistance put Electricity、DCIR、倍 rate Charge put Electricity、靜 Set

limit system article Piece

Time between、 Electricity Pressure、 Electricity flow、 Capacity the amount、-△V Wait near20 Species

Guarantee Protection article Piece

Over Pressure、 owe Pressure、 Over flow、 owe flow、 Over Charge Capacity the amount、 Over put Capacity the amount Wait

超碰射丝袜视频在线 Cheng step number

Do not limit

through Road number

1/2/4/8/16

lose Enter Resistance anti-

≥1MΩ

lose Out square formula

four Electricity pole( support hold Reference ratio Electricity pole Measurement test)

Electricity Pressure fine degree

0.05%RD±0.05%FS( control system and Check Measurement)

Electricity flow fine degree

0.05%RD±0.05%FS( control system and Check Measurement)

Constant Work rate/ Constant Resistance fine degree

0.2%RD±0.2%FS( control system),0.1%RD±0.1%FS( Measurement the amount)

meter Count machine system System Time between

±1 second( no tired meter error difference)

Electricity Pressure Minute Distinguish rate

Fives Bit Have effect number word( from move)

Electricity flow Minute Distinguish rate

Fives Bit Have effect number word( from move)

work Make Electricity source

AC380V 50HZ

lose Enter Work rate

2.4KW( single mold Piece)

Charge Electricity effect rate

≥85%

return Feed effect rate

≥70%

Defense Protection Wait level

IP20

regulation grid ruler Inch

single mold Piece:550mm( width)*432mm( deep)*165mm( high)           

    double Floor cabinet:650mm( width)*720mm( deep)*1200mm( high)        

    six Floor cabinet:650mm( width)*720mm( deep)*1700mm( high)

on One Article:CT6001B

under One Article: No Have Up

Consultation Inquiry in heart

SERVICE

industry Business Consultation Inquiry

China south1905346858 China east2248550299 China north2482555643 China in2456625591 territory outer3059808985 its 狠狠射兽交超碰1937014831

Enterprise industry mail box

tech@gaoel.com.cn

Minute enjoy To:

return To top unit