M310A

M310A.jpg

Production Product special point:

Ø  support hold Electricity Pool、 Electricity Capacity material material research Research、 half Electricity Pool、 three Electricity pole、 buckle formula Electricity Pool、 small Capacity the amount Electricity Pool Wait research Research Measurement test,0~5V all the amount Cheng can control。

Ø  support hold fine dense research Research Measurement test,0.01% Of Electricity Pressure、 Electricity flow fine degree。

Ø  support hold high倍 rate fast Charge research Research,30C can Da0.01% Of Capacity the amount fine degree;100C can Da0.1% Of Capacity the amount fine degree。

Ø  support hold from set Righteousness pulse Flush Measurement test, most small pulse width2mS

Ø  all square Bit cover cover research Research Place need Electricity Pressure、 Electricity flow、 Capacity the amount、 can the amount、 effect rate、 Electricity Capacity、 Inside Resistance Wait Reference number Of Measurement the amount Remember record。

Ø  Assume Prepare from bandUPS with Save Storage, Have effect Defense stop宕 machine、 Burst Of course Broken Electricity、 network Network Therefore barrier Wait situation condition number according to throw Lost damage Bad。

Ø  hard Piece Over Charge Over put Guarantee Protection, Have effect avoid Free Measurement test different often situation condition。


M310A Sex can Means Standard

item Head

instrument Device Means Standard

the amount Cheng

Electricity flow

100uA、1mA10mA100mA

Electricity Pressure

5V  ( can put Electricity to-5V)*1

fine degree

( control system versus Pick kind)

Electricity flow

±0.01%RD±0.01%FS

Electricity Pressure

±0.01%RD±0.01%FS

through Road number


8Chl

色综合网久久 Cheng step number


1024

Time between

fine degree

≤±5uS/S ( Assume Prepare from the Lord control system Transport Row, no through letter Wait Time between Delay late error difference)

most small work step Time between

20mS

most small pulse Flush Time between

2mS

Pick kind control system between Separate

≤10mS*2

lose Enter Resistance anti-


10GΩ(INPUT BASE CURRENT < 0.5nA

temperature degree drift shift


≤20ppm/

ring should Time between


Electricity flow0~90% ≤1mS Electricity flow-90~90% ≤3mS

number according to Pick kind

Pick kind rate

100Hz( Pick kind between Separate Time between10mS*2

Assume Set square formula

between Separate Time between、 Pick kind frequency rate、 between Separate Electricity flow、 between Separate Capacity the amount、 between Separate Electricity Pressure、 between Separate can the amount

Over Cheng control system

work Make mold formula

靜 Set / Constant flow Charge put Electricity/ Constant Pressure Charge put Electricity/ Constant flow Constant Pressure Charge put Electricity/ 倍 rate Charge put Electricity / Constant Work rate Charge put Electricity / Constant Resistance Charge put Electricity / pulse Flush Charge put Electricity / oblique slope Charge put Electricity

cut stop article Piece

Time between / Electricity Pressure / Electricity flow / Work rate / Capacity the amount / can the amount / Follow ring number / week period number

Guarantee Protection

Over Pressure、 owe Pressure、 Over flow、 owe flow、 Over Charge、 Over put、 Over Charge倍 rate、 Over put倍 rate

Broken Electricity Guarantee Protection、 Broken network Guarantee Protection、宕 machine Guarantee Protection

Work can support hold


DCIR、 Electricity Capacity meter Count、 work step pulse Flush、 three Electricity pole Measurement test( Reference ratio Measurement test)、DQ/DV

lose Out square formula


four Electricity pole( support hold Reference ratio Electricity pole Measurement test)

through letter square formula


10/100M Ethernet(RJ45)、USB(Console)

ring territory Want begging

temperature degree Fan Wai

0~40℃(23±2℃ most good fine degree)

wet degree Fan Wai

90% no Condensate dew

work Make Electricity source


AC220V~±10% 50Hz / AC110V~±10% 60Hz,  40W 3

machine box ruler Inch


1U  W*H*L:430*300*43.5(mm)

Note:1. Electricity Pressure the amount Cheng can set system, Fan Wai2~8V。

    2. Pick kind rate can set system1000Hz( Pick kind between Separate Time between1mS)。

      3. for Obtained Got most good Measurement test fine degree versus Ann all, Business must good it is good Connect Ground。 Assume Prepare Make use before, need heat machine30 Minute bell。

on One Article:G210A

under One Article: No Have Up

Consultation Inquiry in heart

SERVICE

industry Business Consultation Inquiry

China south1905346858 China east2248550299 China north2482555643 China in2456625591 territory outer3059808985 its 偷拍丰满少妇换衣1937014831

Enterprise industry mail box

tech@gaoel.com.cn

Minute enjoy To:

return To top unit